logo

Domestic demand for gas has evolved around existing pipeline infrastructure or close to supply sources

Development of backbone infrastructure in under-served regions could stimulate demand for gas as proven by development around ELPS

As at 2020
pipeline 2020

By 2030

Current gas pipeline infrastructure in development plans could require up to $22bn investment

pipeline
A
Pipeline: Ajaokuta-Kaduna-Kano
Regional demand: 1.90 BCFD
Length: 614km
B
Pipeline: Obigbo-Umuahia-Enugu-Ajaokuta
Regional demand: 1.20 BCFD
Length: 406km
C
Pipeline: Obiafu-Obrikom-Oben
Regional demand: 2.00 BCFD
Length: 127km
D
Pipeline: (ELPS)-Ibadan-Ilorin-Jebba
Regional demand: 0.90 BCFD
Length: 335km
E
Pipeline: Kano-Sokoto
Regional demand: 0.08 BCFD
Length: 360km
F
Pipeline: Funtua-Katsina
Regional demand: 0.05 BCFD
Length: 167km
G
Pipeline: Kano-Biu
Regional demand: 0.08 BCFD
Length: 422km
H
Pipeline: Kaduna-Gombe
Regional demand: 0.08 BCFD
Length: 412km
I
Pipeline: Qua Iboe Terminal-Obigbo
Regional demand: 0.40 BCFD
Length: 132km
J
Pipeline: Cawthorne Channel-Obigbo
Regional demand: 0.15 BCFD
Length: 42km
K
Pipeline: Escravos-Lagos-Pipeline-System IV
Regional demand: 1.60 BCFD
Length: 439km
L
Pipeline: Enugu-Adamawa
Regional demand: 0.07 BCFD
Length: 624km
M
Pipeline: Qua Iboe Terminal-Umuahia
Regional demand: 0.40 BCFD
Length: 146km
  1. Ajaokuta kaduna Kano project is "under construction" hence LE is used for cost assumption
  2. Obiafu Obrikom Oben pipeline is approaching completion, LE based on publicly available data used
  3. Low cost estimate is based on West African benchmark cost of pipeline construction ($1.72mm/km) high cost is based on Ajaokuta Kaduna Kano unit cost

Pipelines

AAjaokuta-Kaduna-Kano

BObigbo-Umuahia-Enugu-Ajaokuta

CObiafu-Obrikom-Oben

D(ELPS)-Ibadan-Ilorin-Jebba

EKano-Sokoto

FFuntua-Katsina

GKano-Biu

HKatsina-Gombe

IQua Iboe Terminal-Obigbo

JCawthorne Channel-Obigbo

KEscravos-Lagos-Pipeline-System IV

LEnugu-Adamawa

MQua Iboe Terminal-Umuahia

logo
The Decade of Gas initiative, launched in 2021, is focused on transforming Nigeria into a gas-powered economy by 2030 through series of policy reforms, gas supply projects maturation, gas infrastructure expansion, capacity building and robust investment attraction strategies.

Contact

5th floor
NMDPRA Annex
Shehu Yar’adua way
Jabi, FCT Abuja
Nigeria
+234 705 547 7558
info@decadeofgas.com.ng